Commercial


QUEDGELEY WEST, GLOUCESTER This development provided over 9000m² of internal floor area for warehouse and distribution use. This included a high specification CAT 1 floor construction to satisfy a defined movement racking system, dock levellers, three-storey internal office space and large external yard areas. Client: St Modwen Developments Ltd Contractor: […]

DOWNTONS DISTRIBUTION CENTRE


The development provided over 4000m² of office space and 3500m² of production and warehouse facility. The construction included two storey office buildings connected by a drum shaped reception area, and a portal frame warehouse structure. Client: Robert Hitchins Ltd Contractor: Britannia Construction Ltd Architect: Roberts Gardner Contract Sum: £10 million

G4S TECHNOLOGY, TEWKESBURY BUSINESS PARK


Rowntree Partnership was employed to provide structural design services for a new facility for ADC Krone who had out grown their premises in Cheltenham. The new building covers a footprint area of approximately 2500m2 providing warehousing and two-storey office space. Being one of the last plots to be developed on […]

ADC KRONE, TEWKESBURY, GLOUCESTERSHIRE



The project provided Konica with office and warehouse facilities for a new headquarter centre on the former site of Yardley Perfumes. The development comprised three storey office buildings including entrance atrium, and a large portal frame warehouse structure. Rowntree Partnership were responsible for the design of the piled foundation systems, […]

KONICA OFFICE AND WAREHOUSE HQ FACILITY, BASILDON, ESSEX



This purpose built depot provides hardstandings, workshop and office facilities. We were responsible for full scope of structural services, including the design of the sub, superstructures, and external works. The extent of the concrete hardstanding equated to an area in excess over 15,000m2. These aprons were reinforced using polypropylene fibres, […]

THAMESDOWN BUS DEPOT, SWINDON



When Messier Dowty out grew their existing test facility Rowntree Partnership were employed to design the new building structure. The thing that made this project different was that the existing facility had to remain fully operational during all phases of the construction. Therefore an ‘over build’ structure was required. The […]

LANDING GEAR TEST FACILITY, MESSIER DOWTY, GLOUCESTERSHIRE


These two number light industrial buildings provide 3250m2 and 4100m2 of floor area for distribution and warehouse use. The buildings are piled and suspended due to the poor underlying geology. The projects included a number of dock levellers and large expanses of concrete yard slabs. This practice was responsible for […]

UNIT 8 & HERMES, AVONMOUTH


This purpose built facility provides over 8000m2 of production floor area, along with further office space and external hardstandings. Ground improvement works were required to overcome the soft underlying ground conditions and to achieve the client floor loading requirements. Client: St Modwen Developments Ltd Contractor: Barnwood Construction Ltd Architect: Roberts […]

PRESTOPLAN, QUEDGELEY WEST, GLOUCESTER



TEWKESBURY, GLOUCESTERSHIRE The facility was constructed for the processing of sheet metal to form profiled steel cladding products. The steel frame structure was designed to accommodate several gantry cranes required throughout the building. Rowntree Partnership was responsible for the design of the foundations (including ground treatment specification), superstructure, external yard […]

SAPA BUILDING (FORMERLY CORUS)